Man in Clevershot jacket in front of construction equipment

Silverstone Circuit - Footbridge

Clevershot have captured time-lapse and drone video of the installation of the new Silverstone Circuits footbridge, connecting the iconic Wing Conference Centre with the new Hilton Garden Inn hotel
Intro

About the project

Our client, RG Group, have been constructing a £30m hotel comprising 197 bedrooms Hilton Garden Inn Hotel at the historic Silverstone Circuit.

Complementing the hotel, a link bridge has been installed connecting the new Hotel with the existing Wing, spanning the starting line.

PLAY
Bridging The Gap
Videography

Capturing drone video across 2 visits, we were able to provide RG Group with an incredible catalogue of footage.

The exciting and prestigious nature of the project, alongside our powerful video capabilities, created a perfect union.

PLAY
Travel Through Time
Fixed Camera Time-lapse

We installed and operated 3 of our time-lapse cameras at this site, allowing us to capture the entire month of activity.

The day the bridge was lifted into place being a Clevershot favourite.

Safe, fast & efficient
Behind the Scenes

As always we formed a real partnership with RG Group; maintaining a high level of safety, efficiency and professionalism.

PLAY
CONSTRUCTION

FIND OUT MORE

If you'd like to find out more about how the team here at Clevershot can help you realise your vision for your next project, visit our construction page.